Total microplastics generated and used
Unit :tonnes/kg
Indicator :Waste generation and disposal
Metric Type :Pressure
Frameworks alignment notes
E2-4 28b AR 20
10.1
T7, T16
Target example
Metric is not a measure of progress or impact and does not support development of a target. As this metric is not expected to be prioritized, a draft target has not been developed at this time
Target Source: No metric drafted at this time
Sector
Value chain stage
Metric assessment
Relevance: High
Feasibility: Low