The road from physical risk assessment to action

Physical climate risks are prompting energy companies to assess how extreme weather could affect their assets, operations, finances, and business continuity.

Published

16 November, 2026

Type

WBCSD insights

Share:

Authors

Surbhi Singhvi, World Business Council for Sustainable Development (WBCSD), Diogo Arezes, Bentley Systems

This article collates insights from a WBCSD workshop on how energy companies are moving ‘from physical risk assessment to action’, held as part of WBCSD’s Physical Risk and Resilience for Critical Energy Infrastructure workstream.

Physical climate risk has moved from a safety and compliance matter to a strategic one for energy companies, and assessing it is no longer enough. An assessment creates value when it changes decisions on capital allocation, asset design and business recovery. Assessments themselves are nothing new for energy companies. For most, they have long been routine, driven by health and safety concerns as well as regulatory requirements. What has changed in the last four to five years is the weight they carry on companies’ agendas and the additional drivers behind them. As the frequency and intensity of physical risk events increase, so do their potential impacts on operations and finances as well as on people’s lives.1 As a result, these assessments are now also prompted by concerns about business continuity and uncertainty around insurance. Even companies that haven’t seen material impacts from such events in the past are undertaking these assessments every one to three years to stay informed and ensure resilience in their operations.

Building resiliency in design

The best risk management is to minimize the probability of facing a risk in the first place. This is why many companies build resilience into their infrastructure from the design phase.

An example of this is the use of air-based cooling towers at nuclear power plants, reducing their dependence on river and surface water. Other examples include drones and digital twins that monitor power lines and vegetation, spotting hazards early and speeding up repairs2; flood simulation and early-warning systems to protect critical substations; and steel poles instead of wooden ones to withstand extreme winds3. The extra cost of building in resilience is relatively modest: the World Bank estimates it to be about 3% of the overall infrastructure investment in the case of low- and middle-income countries, with USD $ 4 of benefit for each USD $ 1 invested.4 Returns in high-income countries are comparable as well.5

Frontline teams are best placed to assess exposure

Prevention cannot remove every risk, so companies also need to keep assessing how exposed they are in a fast-changing climate. Although more data is becoming available, local data sets are not standardized, so it is difficult for companies to assess physical risks consistently across their organization. Companies are increasingly empowering and relying on their frontline staff, i.e. local operational teams, to combine these data sets with local and operational knowledge and make informed decisions.

Cross-functional collaboration is key

Irrespective of whether the process from assessment to action is governed in a centralized or decentralized manner within companies, operational and financial views of risk work best when run as separate analyses that closely inform each other.

Operations teams run short-term, site-specific analysis with high-resolution models, while central risk and sustainability teams run portfolio-level, asset-life analysis with lower-resolution models. The two are linked through the enterprise risk management process, using shared time horizons and prioritization criteria, with only the highest-impact risks escalated to group level, where they are evaluated by the finance teams.

Common yet flexible criteria turn assessment into action

Leading companies run assessment as a multi-step process with clearly defined roles for sustainability, risk, operations and external experts at each step. Depending on the governance process, the decision to fund action may rest with central or local operational teams. However, all teams apply the same decision-making criteria, having the flexibility to adapt them to the specific risk, context and local circumstances. Action prioritization weighs risk score, operational impact, asset criticality and the cost of adaptation versus the cost of inaction.

Assets are stress-tested under different warming levels, less to pick a single ‘correct’ scenario than to anticipate structural shifts in climate patterns and their expected impact in the short run. These results increasingly inform design, construction and operational decisions, not just disclosure. Resilience also goes beyond site-level adaptation and mitigation: companies diversify technology mix, geographic footprint and supply chains, and build business recovery plans on top of adaptation measures.

A few bumps on the road remain

Data availability is no longer a barrier: several companies have gone from a few dozen key assets to thousands of locations in the last few years, with scenarios out to 2050 (and 2100 for long-life assets). Geographic Information System (GIS)-based tools are being piloted to visualize climate risks across the group. However, three challenges remain:

1. Impact translation

  • Integrating the large data sets from different sources into operational and financial impact,
  • Further, linking assessment results into required adaptation and mitigation investments.

Companies are addressing this by scoring risks and prioritizing actions against common yet flexible criteria

2. Alignment

  • Building a common understanding of risks across the company,
  • Showing the value of the resilience actions taken.

Leading companies are linking operational and financial views through the enterprise risk management process, with shared time horizons and prioritization criteria.

3. Visibility beyond own assets

  • Seeing risk at critical nodes in the value chain and understanding the potential impact on operations

This remains the least developed area. WBCSD plans to focus on this in the second workshop in November 2026.

As physical risks intensify, the value of an assessment lies in the decisions it changes – where capital is allocated, how assets are designed and how the business recovers. Companies making the most progress keep operational and financial views of risk connected, give each step in the process a clear owner and a budget, and weigh the cost of acting against the cost of inaction.

Footnotes: